S2 expressway - Southern Bypass of Warsaw. Task "C"

S2 expressway - Southern Bypass of Warsaw. Task

Investor: GDDKiA
General Contractor: WARBUD S.A.

P.B.I. PEBIS sp. z o.o. has started to construct storm water network on the S2 expressway

Within Our contract we will built storm water network :

1. from pipes PP DN200-DN1100 - designed length 15265m
2. from pipes PEHD DN160-DN400 - designed length 2941m
3. rainforcement chamber DN1200-DN3200 - 454 items 
4. concrete chamber DN500 - 712 items 
5. separator of petroleum substances - 20 items (form Q=4,16l/s to Q=730l/s)
6. settler suspensions - 20 items (form Q=4,16l/s to Q=730l/s)
7. rainwater pumping station - 6 items (from Q=40l/s to Q=150l/s)